Past Drawings For The 1-3-1 Group Only

Date Combination
Drawn
1-3-1 Group 1-3-1 Sub Groups
Ahead/
Behind
Over
Due
Sub Group Ahead/
Behind
Over
Due
1/1/201815-18-25-31-35 B02-41.71o 3ooe 1o-21.2
10/19/201709-24-27-32-44 B15-30.51o 3oee 1e-10.3
9/25/201714-17-19-30-48 B04-30.31e 3ooe 1e30.9
9/11/201711-23-27-30-48 B18-41.81o 3ooe 1e-10.3
6/26/201707-18-21-30-34 B05-30.11o 3oee 1e-22.1
6/19/201708-23-24-31-33 B01-41.41e 3ooe 1o00.9
4/17/201711-17-25-32-44 B09-35.41o 3ooe 1e-21.9
9/1/201602-17-24-29-44 B1310.71e 3ooe 1e30.4
9/1/201602-17-24-29-44 B1310.71e 3ooe 1e30.4
8/1/201607-17-24-29-45 B1411.51o 3ooe 1o-11.3
5/26/201602-21-22-27-43 B0611.31e 3ooe 1o01
3/28/201612-21-25-30-40 B05211e 3ooe 1e20.4
2/11/201611-27-29-31-36 B0521.51o 3ooo 1e00.2
12/7/201512-21-23-27-37 B0531.61e 3ooo 1o00.2
9/28/201508-19-25-32-48 B1230.31e 3ooe 1e10
9/10/201507-18-20-21-47 B07301o 3oee 1o-10.5
9/7/201516-17-21-32-36 B0720.31e 3ooe 1e00.5
8/20/201512-21-23-25-48 B1710.11e 3ooo 1e00.1
8/13/201506-24-26-27-43 B1800.71e 3oee 1o10.3
7/13/201510-22-31-32-46 B1301.81e 3oee 1e00.4
4/27/201502-20-22-29-45 B0610.41e 3oee 1o00.2
4/6/201503-18-20-32-43 B0500.61o 3eee 1o00
3/9/201506-18-23-31-43 B0600.31e 3ooe 1o00.1
2/19/201512-19-24-31-48 B16-10.51e 3ooe 1e00.1

We are looking for a pattern.

Is the Group trend of going ahead or going behind changing or staying the same?

What's the most overdue this Group has ever been when it was drawn?

How much overdue were the Sub Groups when they were drawn?

These trends might be an indication of what we can expect in the near future for both the Group and Sub Groups.

As an example, if the Group is on a pattern of going ahead of calculations then it might be a good Group to be playing.