Past Drawings For The 4-1-0 Group Only

Date Combination
Drawn
4-1-0 Group 4-1-0 Sub Groups
Ahead/
Behind
Over
Due
Sub Group Ahead/
Behind
Over
Due
3/1/201805-06-07-12-36 B0221.44ooee 1e 030.3
5/25/201706-07-13-16-30 B0130.64ooee 1e 020.4
1/16/201703-15-16-19-26 B0120.84oooe 1e 0-10.6
8/8/201604-07-08-12-23 B0120.44oeee 1o 010.3
5/12/201604-13-15-16-32 B0410.44ooee 1e 010.6
2/22/201608-09-10-11-27 B0411.54ooee 1o 0-10.6
4/16/201501-06-11-13-23 B0110.44oooe 1o 000.2
2/2/201504-08-17-20-21 B0410.44oeee 1o 000.1
11/6/201403-07-14-20-32 B0300.14ooee 1e 010
10/16/201403-04-11-18-24 B42-10.64ooee 1e 000.1

We are looking for a pattern.

Is the Group trend of going ahead or going behind changing or staying the same?

What's the most overdue this Group has ever been when it was drawn?

How much overdue were the Sub Groups when they were drawn?

These trends might be an indication of what we can expect in the near future for both the Group and Sub Groups.

As an example, if the Group is on a pattern of going ahead of calculations then it might be a good Group to be playing.