Past Drawings For The 0-4-1 Group Only

Date Combination
Drawn
0-4-1 Group 0-4-1 Sub Groups
Ahead/
Behind
Over
Due
Sub Group Ahead/
Behind
Over
Due
1/21/201817-19-21-24-27-110.10 4oooe 1o00.2
1/13/201813-14-16-17-32-111.90 4ooee 1e-50.6
9/12/201713-15-16-21-25-100.70 4oooe 1o02.1
7/30/201715-17-20-22-26-112.50 4ooee 1e-56
2/18/201714-18-20-22-29-90.30 4eeee 1o-10.8
1/26/201714-22-23-24-35-102.10 4oeee 1o-32
9/11/201616-19-20-24-32-91.70 4oeee 1e-30.2
5/23/201614-16-17-18-26-82.20 4oeee 1e-42.6
1/6/201613-14-15-24-25-70.30 4ooee 1o00.1
12/20/201513-19-20-22-31-740 4ooee 1o-11.5
4/9/201514-18-22-24-32-520 4eeee 1e00
11/30/201416-18-22-24-28-30.70 4eeee 1e-10.6
10/15/201413-16-19-24-29-40.90 4ooee 1o00.2
8/19/201416-19-20-23-29-40.10 4ooee 1o-11.8
8/12/201413-15-18-23-27-510 4oooe 1o10.1
6/7/201415-16-19-23-27-51.40 4oooe 1o00.9
3/10/201413-14-20-22-29-40.70 4oeee 1o-23.4
1/24/201415-17-22-23-30-54.60 4oooe 1e10.6
4/8/201317-19-20-24-33-10.10 4ooee 1o00.7
3/30/201315-19-21-24-32-20.60 4oooe 1e10.8
2/18/201313-18-21-23-27-20.80 4oooe 1o00.8
12/27/201216-17-18-21-26-20.80 4ooee 1e01.7
11/7/201215-17-19-23-33-30.60 4oooo 1o00.4
9/26/201213-16-20-21-33-30.20 4ooee 1o-10.5
9/14/201214-20-22-23-30-42.10 4oeee 1e-22.2
4/30/201213-18-20-23-25-31.20 4ooee 1o-11.1
2/15/201215-17-22-23-26-20.90 4oooe 1e00.5
12/16/201117-19-20-23-27-21.70 4oooe 1o01.2
9/1/201113-17-18-20-30-21.10 4ooee 1e10.5
6/24/201115-16-18-19-33-200 4ooee 1o-10
6/22/201113-14-15-21-34-30.10 4oooe 1e00.3
6/17/201117-18-22-23-27-410 4ooee 1o-23.4
4/13/201118-19-21-24-28-41.20 4ooee 1e00.5
1/28/201113-15-23-24-30-31.20 4oooe 1e-10.2
11/14/201013-16-17-20-34-30.70 4ooee 1e00.3
10/1/201017-18-19-23-30-30.60 4oooe 1e-21.6
8/25/201017-21-22-24-26-420 4ooee 1e-10.6
4/17/201015-17-19-22-31-30.40 4oooe 1o01.1
3/22/201014-16-21-23-34-33.60 4ooee 1e-11.5
8/4/200920-22-23-24-26-11.80 4oeee 1e-10.8
12/27/200818-19-20-22-2501.10 4oeee 1o00.1
7/12/200813-20-23-24-28000 4ooee 1e-10.9
7/5/200814-15-18-24-35-11.30 4oeee 1o00.5
12/29/200716-17-19-20-29-10.70 4ooee 1o00.3
9/11/200717-19-21-22-33-10.50 4oooe 1o00.2
6/26/200713-14-16-21-35-11.30 4ooee 1o00.3

We are looking for a pattern.

Is the Group trend of going ahead or going behind changing or staying the same?

What's the most overdue this Group has ever been when it was drawn?

How much overdue were the Sub Groups when they were drawn?

These trends might be an indication of what we can expect in the near future for both the Group and Sub Groups.

As an example, if the Group is on a pattern of going ahead of calculations then it might be a good Group to be playing.